To avoid vapourization in the pipe line, the pipe line over the ridge is laid such that it is not more than? Mark as favorite Copy Link 2.4 m above the hydraulic gradient 6.4 m above the hydraulic gradient 10.0 m above the hydraulic gradient 5.0 above the hydraulic gradient Check Answer