PERT requires? Mark as favorite Copy Link single time estimate double time estimate triple time estimate none of these Check Answer
A dummy activity in a net work diagram? Mark as favorite Copy Link is represented by a dotted line is an artificial activity does not consume time or resources all of these Check Answer
In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a? Mark as favorite Copy Link belt conveyor bucket conveyor fork lift truck overhead crane Check Answer
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved? Mark as favorite Copy Link Halsey plan Gantt plan Rowan plan Emerson's efficiency plan Check Answer
PERT? Mark as favorite Copy Link provides an approach for keeping planning up-to-date provides a way for management to require that planning be done on a uniform and logical basis permits management to foresee quickly the impact of variations from the plan all of the above Check Answer
Probabilistic time for completion of any activity can be found out from? Mark as favorite Copy Link optimistic time pessimistic time most likely time all of these Check Answer
The factors which are to be considered while developing a good wage incentive plan will include? Mark as favorite Copy Link adequate incentive ease of administration guaranteed basic pay all of these Check Answer
Routing? Mark as favorite Copy Link prescribes the sequence of operations to be followed determines the programme for the operations is concerned with starting of processes regulates the progress of job through various processes Check Answer
Which of the following are the principles of material handling? Mark as favorite Copy Link keep all the handling to the minimum select only efficient handling equipment move the heaviest weight to the least distance all of the above Check Answer
Travel charts are used to? Mark as favorite Copy Link analyse material handling determine inventory control difficulties plan material handling procedure and routes all of the above Check Answer