As per IRC recommendations, the sub-grade or sub-base layer whatever underlies the concrete shearing slab, in concrete pavements, must confirm to the requirement that? Mark as favorite Copy Link the base or sub-base extends atleast 30 cm wider on either side of the width to be concreted no soft spots are present in the sub-grade or sub-base the sub-grade is properly drained all of the above Check Answer