An irrigation canal is 80 km long. It has an average surface width of 15 m. If the evaporation measured in a Class A pan is 5 mm/day, the volume of water evaporated in a month of 30 days is: (take pan coefficient as 0.7)?

Mark as favorite

Leave a Reply